Boosting Locomotive Productivity Through Operational Excellence in a Major Rail Terminal
Client Context
A leading national freight railroad company sought to improve the performance and throughput of one of its busiest mechanical terminals in Waycross, Georgia. As part of a broader strategy to increase volume through key hubs, ensuring locomotives were service- and inspection-ready became mission-critical. Mechanical leadership needed a rapid improvement in locomotive availability to meet growing demand.
Key Challenges
- The Waycross terminal was experiencing performance bottlenecks and variability in servicing and inspection throughput.
- Labor productivity was below target, resulting in delays in locomotive releases.
- Leadership lacked a standardized approach for workflow execution and performance measurement.
- Safety and quality incidents suggested gaps in frontline execution and operational discipline.
- There was no existing Professional Operating Playbook or structured frontline leadership development framework.
Approach & Key Success Factors
EFESO implemented its transportation-specific Operational Excellence model to rapidly improve throughput and productivity. Key components of the approach included:
-
Data-Driven Diagnostics: Conducted a thorough preliminary data analysis to identify variances in performance and uncover root causes of delays in servicing and inspection workflows.
-
On-Site Validation: Engaged in field-based process observations and interviews with local leaders and staff, guided by industrial engineering principles, to confirm the analysis and operational understanding.
-
Frontline Leadership Enablement: Designed and deployed a hands-on, engaging implementation plan to equip frontline leaders with the tools and mindset for high-performance execution.
-
Operational Excellence Execution: Rolled out a tailored workflow model that leveraged business intelligence to drive performance rigor, elevate leadership behaviors, and standardize work practices.
-
Playbook Development: Created and embedded a Professional Operating Playbook to sustain improvements, clarify expectations, and ensure repeatable success.
Results
82 → 59 hours
Locomotive inspection labor hours reduced
100%
Improvement in safety performance
17%
Reduction in 10-day Line of Road failures
13.6%
Daily locomotive releases increased productivity
$1.8M
Labor productivity savings in the same year
$6.8M
Projected annualized savings